File #: 23-0267    Version: 1
Type: New Business Status: Agenda Ready
File created: 5/9/2023 In control: City Council
On agenda: 5/23/2023 Final action:
Title: Approval of Contract Award with Orion Construction, INC for the VHS Pool Column Repair Project in the amount of $110,818.00
Attachments: 1. VHS Pool Column Repair - Bid Summary, 2. VHS Pool Column Repairs - Contract Body, 3. VHS Pool Column Repairs - Drawings

ITEM TITLE: 

Approval of Contract Award with Orion Construction, INC for the VHS Pool Column Repair Project in the amount of $110,818.00

 

SUBMITTED BY: Austin Rake, Capital Facilities Project Manager

 

FISCAL NOTES: 

Expenditure Required: $110,818.00

Unencumbered Balance: $1,570,877.00

Funding Source: 310-9517-58000

 

RECOMMENDATION:

Approve the contract award with Orion Construction, INC for the VHS Pool Column Repair Project in the amount of $110,818.00

SUMMARY STATEMENT:

Project Description: Repair of corroded structural column at pool area, as well as replacement of existing deck drain system and surrounding concrete to mitigate future column corrosion.

The corrosion at the pool was discovered last fall during routine maintenance activities. The cause of the corrosion is related to the close proximity and assumed connection of the dissimilar metal stainless gutter system to the carbon steel column.

Construction Schedule: September 1st to September 29th, 2023.

Bidding: Two bids were received; one from Wolverine Summit JV and the other from Orion Construction, INC.

Engineers Estimate: Under $150,000.00