File #: 21-0364    Version: 1
Type: Discussion Item Status: Filed
File created: 7/9/2021 In control: Planning and Zoning Commission
On agenda: 7/14/2021 Final action: 7/14/2021
Title: Access Study: Glacier Stream East ASLS 79-116 Project Update
Attachments: 1. 07142021 P&Z Presentation ASLS 79-116

ITEM TITLE: 

Access Study: Glacier Stream East ASLS 79-116 Project Update

SUBMITTED BY: Nathan Duval, Capital Facilities Director

 

FISCAL NOTES: 

Expenditure Required: N/A

Unencumbered Balance: N/A

Funding Source: N/A

 

RECOMMENDATION:

Receive & File

SUMMARY STATEMENT:

The attached presentation is to update the Planning & Zoning Commission on the initial phase of the access study for property east of the Glacier Stream.

The PDC Engineers design team will be available to present the slides and discuss with the commission the current status of the project and methodology as well as future steps.

The property located within ASLS 79-116 consists of approximately 2000-2500 acres of undeveloped City owned property that is currently zoned heavy industrial. The ALPETCO company originally had plans for the area for oil movements and storage but that never came to fruition. Recently, the City sold approximately 200 acres of this land for the purpose of commercial / recreational use. The current draft of the forthcoming comprehensive plan update identifies this area as in need of more study. This access study is one initial step towards future study and potential rezoning or development of the land.

The outcome of the study is to simply identify feasible routes for access as well as rough order of magnitude costs for various feasible options.

This is not a preliminary design nor a construction project; it is a feasibility analysis as part of a larger evaluation of the potential future use of this land. There is no timetable for further action beyond the analysis of potential alternatives identified.