ITEM TITLE: 

Procurement Report: Professional Services Agreement with RSA Engineering for Hermon Hutchens Elementary Waterline Replacement Project in the Amount of $38,460 and for Valdez High School Waterline Replacement Project in the Amount of $35,426

 

SUBMITTED BY: Brad Sontag, Capital Facilities Project Manager I

 

FISCAL NOTES: 

Expenditure Required: N/A

Unencumbered Balance: N/A

Funding Source: N/A

 

RECOMMENDATION:

Receive and file

 

SUMMARY STATEMENT:

Project Description- Hermon Hutchens Elementary School waterline replacement project and the Valdez High School waterline replacement project will be designed separately, resulting in two professional services agreements. The design scope will include replacement of the domestic cold water, hot water, and hot water recirculation piping in the buildings. The piping will be replaced to the existing fixtures where access to the piping is available. Where access to piping is not possible, piping will be connected to the existing branch piping with isolation valves or routed exposed to the fixture.

 

Project Schedule- The contractor must complete the project within 180 days of written notice to proceed.

 

Project Estimate- $38,460 Hermon Hutchens Elementary School; $35,426 Valdez High School

 

Report Filed per City Code 2.80.040