File #: 19-0202    Version: 1
Type: New Business Status: Passed
File created: 4/29/2019 In control: City Council
On agenda: 5/8/2019 Final action: 5/8/2019
Title: Approval of a Contract Award with Jim Psenak Construction, LLC for the Glacier Stream DOT & PF Right of Way to Dump Haul Road Project in the Amount of $385,150.00
Attachments: 1. Glacier Stream DOTPF Right of Way to Dump Haul Road - Contract Body, 2. Glacier Stream DOT & PF Right of Way to Dump Haul Road - Drawings, 3. Glacier Stream DOT-PF Right of Way to Dump Haul Road - Bid Summary
ITEM TITLE:
title
Approval of a Contract Award with Jim Psenak Construction, LLC for the Glacier Stream DOT & PF Right of Way to Dump Haul Road Project in the Amount of $385,150.00

body
SUBMITTED BY: Scott Benda, Capital Facilities Project Manager

FISCAL NOTES:
Expenditure Required: $385,150.00
Unencumbered Balance: $996,000.00
Funding Source: 350-0750-55000.405

RECOMMENDATION:
rec
Approve a Contract Award with Jim Psenak Construction, LLC for the Glacier Stream DOT & PF Right of Way to Dump Haul Road Project in the Amount of $385,150.00.
end
SUMMARY STATEMENT:
Project Description: This project will construct a new, 800 lineal foot long dike along the northwest bank of the Valdez Glacier Stream. It will be located, upstream of the bridge between the upstream end of the new Alaska Department of Transportation & Public Facilities dike and the corner of the Glacier Haul road (Dump road). This new dike will "fill in the gap" between ADOT's new dike and the corner of Dump road thus plugging a hole. Last summer during the outburst event, flood waters from the Glacier Stream eroded an emergency dike that was built in this location back in '15 and flooded the ditch line from the Glacier Stream bridge all the way to the Airport Road intersection. This new dike will be built to the same standards and design as the new ADOT & PF dike and serve to protect the bridge, bike path and Dump road next to the highway and prevent a reoccurrence from last summer's event. The City of Valdez and it's design engineering consultant DOWL worked with and met with the ADOT & PF design engineers over a period of two years to research and develop the project.
Construction Schedule: The Contractor has until June 10, 2019, to complete construction. The expected start date is the week of May 27, 2019.
Liquidated Damages: $1,500.00 per day
Bidding: Length of bid period was 30 days. Two bids were received.
Engineer's Estimate: under $500,000.00
Design Review Stakeholders: Nathan Duva...