File #: 19-0112    Version: 1
Type: Work Session Item Status: Filed
File created: 3/11/2019 In control: City Council
On agenda: 3/14/2019 Final action: 3/14/2019
Title: Fire Station Schematic Design and Preliminary Cost Estimate
Attachments: 1. Valdez Station_20190311 SD Set, 2. Renderings

ITEM TITLE: 

Fire Station Schematic Design and Preliminary Cost Estimate

SUBMITTED BY: Nathan Duval, Capital Facilities Director

 

FISCAL NOTES: 

Expenditure Required: N/A

Unencumbered Balance: N/A

Funding Source: N/A

 

RECOMMENDATION:

Receive and File

SUMMARY STATEMENT:

Wolf Architecture will be on site with their team to update the Council on progress to date with the fire station project. The team will present the schematic design and some conceptual renderings to help visualize the current design status.

As part of the design presentation, Wolf will provide the Council with the current construction cost estimate; this estimate is the basis for the anticipated total project cost and subsequent Bond amount request to the voters.

Attachments include condensed schematic design plat, floorplans, sections, and renderings.