ITEM TITLE:
title
Approval of a Contract with Orion Construction, Inc. for the Valdez Swimming Pool Renovation in the Amount of $3,115,000.00.
body
SUBMITTED BY: Scott Benda, Capital Facilities Project Manager
FISCAL NOTES:
Expenditure Required: $3,115,000.00
Unencumbered Balance: $4,213,670.97
Funding Source: 350-0310-55000.1419
RECOMMENDATION:
rec
Approve the Contract with Orion Construction, Inc. for the Valdez Swimming Pool Renovation in the Amount of $3,115,000.00.
end
SUMMARY STATEMENT:
The Valdez Swimming Pool Renovation project was out to bid for thirty one days and five (5) bids were submitted. Orion Construction, Inc., of Wasilla submitted the low bid of $3,115,000. The project consists of the base bid ($1,914,000) which encompasses the work inside the natatorium. Base bid renovations include replacement of the existing plaster and tile finish, depth markers, concrete gutters and main drain grate covers in both the lap pool and wading pool. Refinishing of the existing swimming pool area concrete deck with new slip resistant finish. Installation of metal grid ceiling and acoustical panels in the natatorium. Replacement of all light fixtures in Natatorium. Installation of new metal security gate at existing stairs and new mechanical plumbing from pool mechanical room to new pool gutters.
Additional work on the project includes two additive alternates. Additive alternate #1 ($915,000) entails all the work to remodel the existing shower and restrooms, office and waiting area. It includes: Replacement of light fixtures, mechanical equipment, and plumbing fixtures with new fixtures in the locker rooms, family change room, and reception & waiting areas. Reconfiguration of the locker room showers with new floor, wall and ceiling finishes. Replacement of Locker room and change room lockers and benches with new lockers and benches. Replacement of Reception counter with new reception counter, and new floor, wall, and ceiling finishes. Replacement of ext...