File #: 18-0283    Version: 1
Type: Discussion Item Status: Filed
File created: 7/10/2018 In control: City Council
On agenda: 7/17/2018 Final action: 7/17/2018
Title: Discussion Item: Kelsey Dock Phase II
Attachments: 1. Valdez Warehouse 1 - Concept Design Documents, 2. Valdez Warehouse 1 - Concept Design Estimate

ITEM TITLE: 

Discussion Item: Kelsey Dock Phase II

 

SUBMITTED BY: Nathan Duval, Capital Facilities Director

 

FISCAL NOTES: 

Expenditure Required: N/A

Unencumbered Balance: $334,200.00

Funding Source: 312-6400-58200

 

RECOMMENDATION:

Receive & File

SUMMARY STATEMENT:

Kelsey Dock Phase I - Interpretative Center and Security Office is currently under construction. As part of ECI’s presentation to council, a second phase was discussed relative to the “yellow building”. The consensus at the time was to find a way to utilize the storage area and provide building upgrades to the exterior cladding, the Museum entrance and interior envelope. Attached is ECI’s conceptual design as well as a ROM cost estimate for the work to remove the southern third of the building, upgrade the exterior, add a museum entrance, upgrade the interior necessary to protect museum collections adequately, and relocate Parks & Rec. to the northern third of the warehouse. This project is on the current CIP list and the Capital Facilities department is seeking general consensus from the current council that the project should move forward as proposed, with modifications, or not at all.

The estimated cost of construction as presently designed is approximately $2.2M, with an anticipated total project budget of $2.5M-$3M.